a Nexage AI agent
Procurement and sourcing agent

Makes quotes
comparable.

One in PDF, one in Excel, one in an e-mail body; every supplier writes a different unit, different payment terms, different delivery conditions. The agent prepares and distributes the RFQ, normalizes incoming quotes into one table, produces the total cost matrix with freight, payment terms and lead time, and recommends with the supplier's history. Supplier selection and order approval always rest with the purchasing manager.

RFQ creation and distributionQuote normalization (PDF/Excel/e-mail)Total cost matrixSupplier performance and risk
Satın Alma & RFQ Ajanı karakteri
Procurement & RFQ Agent
Procurement & RFQ Agenttask flow · on-premise
Sample task flow · every approval is written to corporate memory
!3 quotes · 3 formats → 1 matrix
✓recommend: B · awaiting approval
Minutesto turn quotes in 3 formats into one matrix · instead of days · sample
Totalcost: price + freight + payment terms + lead time on one basis
90%+target supplier response rate · with reminders and gap tracking · sample
Managerapproval is required before any supplier is chosen or an order is placed

It takes over the formats and calculations; the purchasing team decides

The agent learns the supplier master and order history in the ERP and the company's purchasing rules; cuts quote collection and comparison from hours to minutes and brings the purchasing team only the table that needs a decision.

RFQ creation and distribution to suppliers

Drafts the RFQ from the requisition line with specification, quantity, delivery point and deadline; distributes it to the approved supplier list by e-mail or portal and reminds those who have not replied.

"RFQ-0917 · sent to 6 suppliers · 4 replies, 2 reminders"

Normalizing incoming quotes into one table

Reads quotes in PDF, Excel and e-mail bodies; brings units, currency, VAT, quantities and line matching to the same basis. Asks the supplier for missing or unclear fields.

"3 formats → 1 table · 2 missing fields requested"

Total cost matrix

Adds freight, payment-term cost, lead-time delay risk and warranty terms next to the unit price; ranks by the purchasing criterion (lowest total cost, shortest lead time, longest payment terms).

"A cheapest per unit · B ahead on total cost (90-day terms)"

Supplier performance history and risk

Extracts on-time delivery, quality rejections and price deviation from the ERP order history; reports single-source dependency and financial risk signals.

"B: 14 orders · 93% on time · 1 quality rejection"

Compliance with contract and order terms

Compares the payment, delivery, penalty and warranty terms in the quote with the company's standard purchase terms and framework contract; flags deviations and routes them to the legal agent.

"No penalty clause · off standard terms → legal opinion"

Summary and recommendation for the approval flow

Presents the matrix, reasoned recommendation and risks on one page to the purchasing manager; after approval prepares the order draft in the ERP and writes the decision to corporate memory with its reason.

"Recommend B · 1-page summary · order draft after approval"

A sample day with the procurement agent

A representative working day: from the RFQ going out to the order draft, which work the agent finishes alone and which it submits for the purchasing manager's approval. Every decision is taught to the next similar purchase.

  1. Requisition: 1,200 bearings, within 3 weeks
    A purchase requisition arrives from production planning. The agent opens the specification, past purchases and the approved supplier list.
  2. RFQ-0917 prepared, sent to 6 suppliers
    RFQ draft with specification, quantity, delivery point and reply deadline (2 days); the purchasing specialist reviewed and sent it.
  3. Day 3: 3 quotes, 3 different formats
    Supplier A in PDF, B in Excel, C in an e-mail body. 2 suppliers did not reply despite reminders, 1 said "out of stock".
  4. Matrix ready: on a total cost basis
    A is cheapest per unit but 60-day lead time and prepayment; B 7-day lead time, 90-day terms, freight included. B leads on total cost; A's lead time does not fit the production plan.
  5. Supplier history and terms check
    B: last 14 orders, 93% on time, 1 quality rejection. C's quote has no penalty clause → off standard terms, note to the legal agent. Recommendation: B, with reasons.
  6. Purchasing manager approved: B
    The manager reviewed the matrix and reasoning; added a negotiation note to extend B's warranty from 12 to 18 months. The negotiation is handled by the purchasing specialist.
  7. Order draft in the ERP, decision in memory
    Agreed with B on an 18-month warranty. The order draft is in the ERP approval flow; the decision is written to corporate memory with its reason, and the agent will show this precedent on the next bearing purchase.
Procurement & RFQ Agent
Quote comparison matrix · sample3 suppliers · 3 formats · on a total cost basis

Three suppliers send quotes in three different formats; the agent brings unit, currency, freight, payment terms and lead time to the same basis, calculates the total cost and presents it to the purchasing manager with a reasoned recommendation.

rfq_2026-0917_bearings_matrix.xlsxRFQ-0917 · 1,200 bearings
Unit priceA 41,20 · B 43,80 · C 44,50 €normalized
FreightA +2.400 € · B dahil · C +1.900 €added
Payment termsA peşin · B 90 gün · C 30 günconverted to cost
Lead timeA 60 gün · B 7 gün · C 21 günA misses the plan
Contract termsC: ceza maddesi yoklegal opinion
Criterion: total cost + lead timeSupplier B · 14 past orders, 93% on timeSend for approval

How does it work in your company?

Pick your industry to see which purchases the procurement agent takes over and how it works with your team.

Procurement & RFQ Agent — Manufacturing sector
Sample tasklive
Quotes came in for the bearing purchase, which one do you recommend?
3 quotes in one matrix: A is cheapest per unit but 60-day lead time, does not fit the plan. B 7-day lead time, 90-day terms, freight included; ahead on total cost and 93% on time over the last 14 orders. Recommendation B; on your approval I will prepare the order draft in the ERP.

Raw materials, spare parts, consumables; hundreds of lines, dozens of suppliers, one matrix.

Turns requisitions from the production plan into RFQs, compares raw material and spare part quotes on a total cost and lead-time basis; reports single-source risk on critical parts and suggests alternative suppliers.

  • Raw material purchasingBrings unit, currency and freight differences to the same basis, matches lead time with the production plan.
  • Spare parts and MROCompares recurring small purchases with framework agreements and past prices.
  • Single-source riskReports dependency on one supplier for critical parts, suggests alternatives.
  • Quality historyAdds quality rejection and return history to the supplier score.
Totalcost matrix
Lead timematched to plan
Single sourcerisk report

Four steps, in-house

  1. 01

    Connect

    ERP (requisitions, orders, supplier master), e-mail, supplier portal and e-tendering connections where available; specification templates, standard purchase terms and framework contracts are uploaded.

  2. 02

    Teach

    Rules are defined with the purchasing team: purchasing criterion (total cost, lead time, payment terms), approval amount thresholds, the approved supplier list, which deviations go to legal.

  3. 03

    Run

    The agent prepares and distributes RFQs, normalizes quotes, produces the matrix and recommendation; supplier selection and orders are always finalized with the purchasing manager's approval.

  4. 04

    Improve

    Every approval, rejection and negotiation outcome is written to corporate memory with its reason; supplier performance is updated with every order, and the agent shows these precedents on the next similar purchase.

Systems it connects to
ERP (requisitions, orders, supplier master)E-mailSupplier portalE-tendering platformsContract management (NexCLM)Excel / PDF quote files

The agent works; decisions stay with the company

Every agent runs on-premise or in your own cloud; what it may do alone and what it submits for approval is defined by the authority matrix.

Runs in-house

Quotes, prices and supplier data never leave the company; the agent runs on-premise or in your own cloud. Commercially sensitive price information is opened only to authorized roles.

Authority matrix

What the agent does alone and what it submits for approval: defined by purchase amount, category and role. Supplier selection and orders always rest with the authorized purchasing manager.

Source and trail for every recommendation

Every figure in the matrix shows which quote document and which calculation it comes from; every RFQ, quote and decision is recorded with a timestamp. Reversible for audit and tender objections.

Human in the loop

Negotiation, supplier selection and contract-term decisions are always made by people. The agent calculates, compares and recommends; communication with suppliers runs under the purchasing team's name and knowledge.

Common questions

Do suppliers have to use a portal?

No. E-mail is enough; the agent reads quotes in the e-mail body and in attached PDF/Excel files. For suppliers that use a portal the same flow runs through the portal; both merge into the same matrix.

Does the agent negotiate prices?

No. It prepares a negotiation suggestion from the target price, past purchases and competing quotes; communication with the supplier runs under the purchasing team's name and decision. The negotiation outcome is recorded and taught to the next purchase.

Does it report single-source risk?

Yes. It reports dependency on one supplier for critical lines, supplier financial signals and past delivery performance; it suggests alternative suppliers. Accepting the risk or deciding on a second source rests with purchasing management.

How accurately does it read quotes in different formats?

Units, currency, VAT, quantities and terms are read from PDF, Excel and e-mail bodies; fields read with low confidence or unclear ones are flagged and shown to the purchasing specialist, and confirmation is requested from the supplier if needed. Every figure in the matrix is linked to its source document.

Where is quote and price data stored?

Data stays on-premise or in your own cloud; nothing is transferred outside. Price and supplier information is treated as a trade secret and opened only to the relevant roles by the authority matrix; every access is logged.

Which ERP and procurement systems does it work with?

Ready connections exist for common ERP systems (requisitions, orders, supplier master); others are connected via API or file transfer. E-tendering platforms and supplier portals are scoped per project and clarified in the discovery meeting.

How long does setup take and how is it priced?

Usually 4–8 weeks including the ERP connection, specification templates and purchasing rule definition. Pricing is an annual license + setup based on annual RFQ volume, number of categories and connected systems; a firm quote follows discovery.

See the procurement agent with your own quotes

In a 30-minute demo we upload the real quotes from one of your recent purchases together; see with your own eyes how the agent builds the matrix, calculates total cost and what it leaves to the team.

İzmir R&D Center: Dokuz Eylül University Main Campus, Doğuş Caddesi No:207/Z DEPARK Alfa Building, BambuGO, Buca / İzmir
Istanbul Office: Maya Anatolium Tower, Floor 3, Kollektif House, Nexage Yazılım, No: 307, 34880 Kartal / Istanbul
E-mail and phone: info@nexage.ai · 0 549 763 21 88